Brief: We were appointed by the main contractor to carry out the
HVAC and Public health elements of l project which consisted of the following;
Cassette and wall mounted air conditioning systems
Ducted air conditioning systems
Air Source heat pump Hydrobox
Above Ground Drainage
Heat Recovery Ventilation
General and W/C Ventilation
Supply and installation sanitaryware
Programme: September – November 9 weeks total
Project Value: circa £140K